Sheetrock

Sheetrock

At MyChoice Builders Inc, we specialize in providing comprehensive sheetrock and drywall services for commercial construction projects. Our expertise ensures that your walls and ceilings are installed to the highest standards, offering durability and a perfect finish. We cover all aspects of drywall installation, including tape and bed, and texture application. Below, you'll find detailed information on our services and the installation process, as well as our trusted suppliers.

Sheetrock, also known as drywall, is a common material used for constructing interior walls and ceilings. It is favored for its ease of installation, cost-effectiveness, and ability to provide a smooth, paint-ready surface. Drywall comes in various sizes and types to suit different applications.

Sheet Sizes

4 by 8, 4x10 Feet Sheets

Ideal for standard wall heights, these sheets are easier to handle and install, making them suitable for most residential and commercial projects.

4 by 12 Feet Sheets

These longer sheets are perfect for reducing the number of seams on larger walls and ceilings, resulting in a smoother finish with less joint compound and sanding needed.

Specialty Drywall

Mold-Resistant Sheets (Green Board): These sheets are designed for use in high-moisture areas such as bathrooms, kitchens, and basements. The mold-resistant properties help prevent mold and mildew growth, ensuring a healthier indoor environment.

Top Suppliers

USG Corporation

A leading manufacturer of drywall and joint compound products known for their quality and reliability.

National Gypsum

Offers a wide range of drywall products, including specialty boards for moisture and fire resistance.

CertainTeed

Provides high-performance drywall solutions with a focus on sustainability and innovation.

Georgia-Pacific

Known for their durable and versatile gypsum boards suitable for various applications.

American Gypsum

Offers quality drywall products with excellent fire resistance and sound control properties.

STEPS

Installation Process

01

Preparation

Measure and cut drywall panels to fit the wall or ceiling space.

02

Framing Attachment

Secure the drywall panels to the framing using screws or nails, ensuring proper alignment and spacing.

03

Cutouts

Create cutouts for electrical outlets, switches, and other fixtures.

04

Joint Treatment

Apply joint tape and compound to cover seams and fasteners.

05

Sanding

Sand the joints to create a smooth surface ready for finishing.

Why Choose Us for Sheetrock/Drywall Installation

We use top-quality materials from trusted suppliers to ensure durability and a flawless finish. Our experienced team ensures precise installation, resulting in perfectly smooth walls and ceilings.