Texture Application
Texture application adds a decorative finish to drywall surfaces, providing visual interest and helping to hide imperfections. There are various texture styles, each with its own unique appearance and application method.
Types of Texture
Orange Peel
A subtle, dimpled texture resembling the skin of an orange. It is applied using a spray gun and is popular for its ability to hide minor imperfections while providing a modern look.
Knockdown
This texture is created by applying a thick layer of joint compound and then "knocking down" the peaks with a trowel, resulting in a flattened, stucco-like finish. It is both attractive and functional, providing a durable surface.
Popcorn
A heavier texture often used on ceilings. It is applied using a spray hopper and is effective at sound dampening.
Smooth Finish
A completely smooth surface achieved through meticulous application and sanding of joint compound. It provides a clean, modern look but requires a high level of skill to execute flawlessly.
Skip Trowel
A textured finish created by applying joint compound with a trowel in a skipping motion, leaving a pattern of raised areas and smoother sections.
Top Suppliers
USG Corporation
Offers a wide range of texturing products and tools for different finishes.
CertainTeed
Provides high-quality texturing compounds designed for ease of application and consistent results.
Homax
Specializes in texture sprays and tools for creating various textures.
TexMaster Tools
Offers tools and materials for professional-grade texturing.
Marshalltown
Known for their durable and versatile drywall texturing tools.
Installation Process
Preparation
Ensure the drywall surface is clean and primed.
Mixing
Prepare the texturing compound according to the manufacturer’s instructions.
Application
Apply the texture using a sprayer, roller, or trowel, depending on the desired finish.
Pattern Creation
Create the desired texture pattern using specific tools or techniques.
Drying
Allow the texture to dry completely before painting or further finishing.
Why Choose Us for Texture Application
We offer a variety of texture options to match your aesthetic preferences. Our experienced team uses high-quality materials and tools to ensure a consistent and professional finish.
