What Is Written?
Do not rely on a verbal “lifetime” statement. Ask for the actual contract and manufacturer documents.
Warranty Information
A practical guide to construction workmanship obligations, manufacturer coverage, registrations, maintenance, and reporting a concern.
One Vision.
One Connected Team.
Two Different Kinds Of Coverage
The construction agreement should state any project-specific workmanship obligations, start date, duration, exclusions, notice procedure, access requirements, emergency responsibilities, transfer terms and remedies. Manufacturer warranties are separate documents controlled by the manufacturer and may require product registration, matching components, certified installers, inspections, maintenance, proof of purchase and timely claims.
Closeout should identify installed products, available serial numbers, manuals, registration steps, care instructions, filter or maintenance schedules, paint and finish information, and the contact path for a concern. Normal wear, owner modifications, lack of maintenance, movement, abuse, severe weather, excluded conditions and third-party work may not be covered.
Before You Sign
Do not rely on a verbal “lifetime” statement. Ask for the actual contract and manufacturer documents.
Know whether the builder, trade contractor, supplier or manufacturer handles each type of issue.
Roof, sealant, drainage, filters, finishes, equipment and exterior systems need documented care.
Follow written notice, documentation and access requirements and protect the property from further damage.
Practical FAQs
Terms depend on the executed contract and scope. Review the written project-specific obligations before signing.
Not always. Some require matching components, certified installation, inspection, registration, maintenance or fees.
Applicable manuals, product and finish information, warranty documents, registration instructions, inspection or permit closeout, and identified maintenance requirements.
Generally, manufacturer or workmanship coverage is not property insurance. Review the actual documents and insurance policy.
Unauthorized alterations or third-party work may affect coverage. Document the condition and contact the responsible party before changes.
Use the notice method in the contract, provide photos and dates, allow reasonable inspection access, and take reasonable steps to prevent additional damage.
Licensed · Bonded · $5M Insured
Bring plans, a property address, or simply an idea. We’ll help you understand the next step.
Professional protection for residential and commercial work. No finished plans required.A More Useful Starting Point
A written closeout and service framework that distinguishes construction warranty, product warranty and maintenance.

Property & Existing Conditions
Record pre-existing conditions and the contracted work so service questions can be traced to the completed scope.
Design Development
The contract should identify workmanship coverage, exclusions, notice process, access, emergency conditions and manufacturer coverage.

Technical Coordination
Systems must be commissioned and owner operation explained; misuse or missing maintenance can resemble a construction defect.
Budget Structure
Warranty administration should be included in project overhead rather than presented as undefined goodwill.

Schedule Logic
Closeout dates, seasonal observation and manufacturer deadlines belong on the owner calendar.
Quality Control
Use final inspection records, startup reports, photos, product data and signed punch completion as the baseline.
Owner Information
Retain contract, changes, invoices, approved selections, permits, inspection reports, manuals and warranty certificates.
Decision Checklist
Read written duration and exclusions.
Follow the required written reporting process.
Mitigate active damage and notify promptly.
Document filters, sealants, drainage and product care.
Authoritative Planning Links
Requirements, fees and adopted codes can change. These first-party resources are the right starting point; the project team should confirm the current rule for the exact address and scope.