◆ LICENSED · BONDED · $5M INSURED
Let’s Talk (817) 752-5900

Accessibility Planning

Check The Texas $50,000
Architectural-Barriers Threshold.

A plain-English screening tool for early commercial-project planning.

One Vision.
One Connected Team.

DALLAS–FORT WORTH / NORTH TEXAS
Free Planning Tool

TDLR Accessibility Screening

Enter the estimated construction cost and answer the facility questions.

Important

Compliance Does Not Begin At $50,000.

Texas projects with an estimated construction cost of $50,000 or more may require registration, plan review and inspection under the Architectural Barriers program when subject to the Act. Projects below the threshold may still have to comply with the Texas Accessibility Standards and other accessibility laws. This tool is not a determination by TDLR, a Registered Accessibility Specialist, an architect or an attorney.

Licensed · Bonded · $5M Insured

Include Accessibility In The Plan Before Permit Submission.

Bring plans, a property address, or simply an idea. We’ll help you understand the next step.

Professional protection for residential and commercial work. No finished plans required.

Use The Screen Correctly

Accessibility Is A Design And Construction Workstream.

The checker identifies planning questions; it does not register a project, replace a Registered Accessibility Specialist or determine compliance. Confirm the current Texas Architectural Barriers requirements, estimated construction cost, owner responsibilities and registration/review path directly with TDLR and the project design team.

Accessibility affects the route from parking or public way through entrances, doors, circulation, service counters, toilet rooms, drinking fountains, rooms and site amenities. Details must remain coordinated through submittals, field changes and final inspection.

01

Define The Project

Identify owner, address, scope, construction cost and applicable registration milestone.

02

Map The Route

Coordinate site slopes, parking, curb ramps, thresholds, doors and interior circulation.

03

Detail The Elements

Resolve reach ranges, clear floor space, toilet rooms, counters, hardware and signage.

04

Protect Compliance

Review substitutions and field changes before they alter approved clearances or slopes.

Questions About This Guide

Does a project below $50,000 automatically avoid accessibility requirements?

No. The checker screens the registration threshold, not every accessibility obligation or exemption. A lower construction value does not itself establish that accessibility standards are inapplicable. Confirm the project with the appropriate accessibility professional.

Can this tool approve my plans?

No. It does not replace registration, plan review, inspection or a Registered Accessibility Specialist. Use it to identify a discussion point early, then document the required accessibility route for the actual project.

Call Our TeamStart Your Project ↗