Irving Construction

Irving General Contractor.
Residential & Commercial Construction.

Irving projects range from mature residential neighborhoods to Las Colinas offices and commercial corridors. Existing conditions, airport-related constraints where applicable, utilities and the intended occupancy should be understood before pricing.

One Vision.
One Connected Team.

DALLAS–FORT WORTH / NORTH TEXAS

Local Construction Lens

Redevelopment Between Established Buildings

Residential additions need a careful tie-in strategy for foundation, roof, drainage and mechanical systems. Replacement homes benefit from early surveys, tree review and a demolition plan that protects adjacent property.

Office, clinic and retail conversions should begin with the lease, landlord criteria, available MEP capacity, accessibility and fire review—not finish selections.

Useful First Documents

Turn An Address Into A Buildable Scope.

Property File

Current survey, parcel information, title exceptions, restrictions and any prior plans.

Site Evidence

Photos, utility information, drainage or flood documents and known soil or access issues.

Project Program

Intended use, approximate size, room or equipment list, finish level and operating needs.

Decision Frame

Budget range, financing or lease milestones, target date and the approvals already identified.

Start With The Property

Irving Planning Questions.

What Determines The Permit Authority?

The parcel location, city limits, ETJ status, use and trade scope determine which authorities and utilities are involved.

Can You Review A Property Before Design?

Yes. A construction-feasibility review organizes the site, utility, access, restriction and budget questions that should shape design.

What Makes A Local Budget Useful?

A survey, intended use, approximate area, existing-condition information, finish level and known site requirements make the range more meaningful.

Can Residential And Commercial Work Use The Same Process?

Both begin with property, use, scope, approvals and budget, but commercial work adds occupancy, fire, accessibility, operations and lease responsibilities.

Licensed · Bonded · $5M Insured

Plan An Irving Project With The Site In View.

Bring plans, a property address, or simply an idea. We’ll help you understand the next step.

Professional protection for residential and commercial work. No finished plans required.

A More Useful Starting Point

What A Strong Project Plan Must Accomplish.

Irving construction should be planned around the city’s online permit process, use-specific departmental review and the site’s location within a mature, heavily developed utility network.

Surveyed homesite and preserved trees
Surveyed homesite and preserved trees · Illustrative construction visualization

Property & Existing Conditions

The Site Changes The Scope.

Existing Irving properties often require careful verification of easements, setbacks, prior improvements and available service capacity. Commercial corridors may add fire, health, traffic, landscape, water-quality and change-of-use review depending on the tenant.

Design Development

Resolve Use Before Appearance.

For most residential and commercial permits, plans showing the proposed work are required. Commercial finish-outs should identify delivery condition, use, egress, accessibility, MEP, fire protection and landlord scope before lease assumptions become construction commitments.

Infill construction and neighbor protection
Infill construction and neighbor protection · Illustrative construction visualization

Technical Coordination

Make The Assemblies And Systems Agree.

Coordinate special inspections where required, drainage/floodplain questions, fire review, health review for regulated uses and final certificate needs. The approved set and online comments should be reconciled before field release.

Budget Structure

Price The Decisions That Actually Move Cost.

Budget demolition, unknown existing conditions, utility upgrades, fire/life-safety work, accessibility, landlord requirements and business shutdowns separately from finishes.

Completed acreage site and drainage
Completed acreage site and drainage · Illustrative construction visualization

Schedule Logic

Build The Sequence Around Dependencies.

Irving publishes a six-business-day review target for commercial plans and revisions, but departmental comments and applicant response time affect the real calendar. Build permit corrections and long-lead procurement into the schedule.

Quality Control

Inspect Before Work Is Covered.

Track inspections in the city portal, retain special-inspection reports where applicable and verify final approvals before occupancy.

Owner Information

Documents That Make The First Review Productive.

Provide lease/work letter where applicable, property and suite information, survey, existing drawings, test fit, equipment loads, intended use, photos and opening target.

Decision Checklist

Questions To Close Before Commitment.

01

Property rights

Check setbacks and utility easements.

02

Existing systems

Verify electrical, plumbing, HVAC and fire capacity.

03

Use review

Identify fire, health or planning departments involved.

04

Closeout

Define inspection, special-inspection and occupancy deliverables.

Authoritative Planning Links

Verify The Property Against Current Public Requirements.

Requirements, fees and adopted codes can change. These first-party resources are the right starting point; the project team should confirm the current rule for the exact address and scope.