◆ LICENSED · BONDED · $5M INSURED
Let’s Talk (817) 752-5900

Custom Home Concept

Texas Courtyard.
2,200 Square Feet.

A quiet center court brings daylight into the heart of a compact one-story home.

Texas Courtyard exterior architectural concept
Architectural Design Concept

How The Home Works

Courtyard-Led Circulation

The entry, great room and primary hallway frame a protected outdoor room instead of wasting area on long corridors. The kitchen can watch both the living room and courtyard, while secondary bedrooms sit together on the opposite side.

Property Match

Best Site Fit

Works well on wider suburban or acreage lots where the house can wrap around private outdoor space. Tree placement, western sun, roof drainage and the courtyard finished elevation should be resolved together.

Build It Intentionally

Construction Focus

Multiple inside corners require disciplined flashing, roof drainage and waterproof transitions. Large courtyard glass affects structural headers, solar gain and HVAC zoning, so those decisions belong in design rather than after framing.

Courtyard Use

Dining garden, plunge pool, outdoor fireplace or a simple shaded sitting court.

Kitchen Relationship

One long island, a scullery option and direct sightlines to indoor and outdoor gathering areas.

Primary Suite

Private courtyard access with a bath and closet buffered from the great room.

Garage Arrival

A mudroom path that reaches the pantry without crossing the formal entry.

2026 Planning Range

$495,000–$715,000

For an early DFW construction discussion, this 2,200-square-foot concept uses a broad range of $495,000–$715,000. Land, design, financing and unusual site infrastructure remain separate until included in a written scope.

Read the shared planning and property-review guidance.

Licensed · Bonded · $5M Insured

Adapt The Texas Courtyard To Your Property.

Bring plans, a property address, or simply an idea. We’ll help you understand the next step.

Professional protection for residential and commercial work. No finished plans required.
Surveyed homesite and preserved trees
Surveyed homesite and preserved trees · Illustrative construction visualization
Infill construction and neighbor protection
Infill construction and neighbor protection · Illustrative construction visualization
Completed acreage site and drainage
Completed acreage site and drainage · Illustrative construction visualization
Call Our TeamStart Your Project ↗