Statutory Applicability
Municipal and county population, existing zoning, excluded conditions, project initiation date, and proposed use.
Texas SB 840
Evaluate qualifying DFW commercial property for multifamily or mixed-use development under Texas Local Government Code Chapter 218.
One Vision.
One Connected Team.
Effective September 1, 2025
Texas Senate Bill 840 added Chapter 218 to the Local Government Code. For a qualifying municipality—population above 150,000 and located wholly or partly in a county above 300,000—the law generally requires certain office, commercial, retail, warehouse, or mixed-use zoning classifications to allow qualifying mixed-use residential or multifamily residential development without a rezoning, special exception, variance, or similar discretionary land-use approval. Statutory exceptions and local implementation still matter.
The law does not eliminate building code, fire, accessibility, platting, utilities, drainage, floodplain, traffic, environmental, airport, heavy-industrial, engineering, or other applicable reviews. Applicability should be confirmed with land-use counsel and the municipality before acquisition or design commitments.
Feasibility Before Design
Municipal and county population, existing zoning, excluded conditions, project initiation date, and proposed use.
Structure, bay depth, daylight, floor-to-floor height, stairs, elevators, parking, utilities, fire access, drainage, and open space.
Occupancy change, construction type, fire ratings, egress, sprinklers, accessibility, energy, acoustics, ventilation, and structural loads.
Acquisition basis, unit yield, hard cost, soft cost, financing, carrying cost, incentives, schedule, lease-up, and contingency.
Where The Opportunity Fits
The strongest candidates may include underused retail parcels, aging office sites, shallow industrial or warehouse land, and commercial corridors where utilities, access, neighborhood context, and market demand support housing. The site still has to work physically and financially. A conceptual yield study should test setbacks, height, density, parking, fire access, detention, utilities, unit mix, and amenity area before a buyer relies on the zoning pathway.
My Choice Builders can support construction feasibility, conceptual scope, budget ranges, phasing, and preconstruction coordination. Legal interpretation, entitlement opinions, market studies, civil design, architecture, and engineering remain with the appropriate professionals.
Practical FAQs
No. It applies only where statutory population and other requirements are met, and exceptions exist. Verify the current law and site with counsel and the municipality.
No. Building, fire, accessibility, utilities, drainage, platting, floodplain, engineering, and other reviews still apply.
For qualifying development and zoning classifications, the statute limits certain rezoning or discretionary land-use requirements. Obtain a project-specific legal determination.
Survey, title and restrictions, zoning confirmation, utility and drainage information, conceptual site plan, unit yield, code analysis, schedule, and preliminary development budget.
Several large DFW municipalities may meet the population framework, but applicability must be checked using current data and the exact statutory criteria.
No. The page provides construction-feasibility information and is not a legal opinion.
Licensed · Bonded · $5M Insured
Bring plans, a property address, or simply an idea. We’ll help you understand the next step.
Professional protection for residential and commercial work. No finished plans required.Construction In Context
These visuals illustrate the types of assemblies, coordination points and finished conditions discussed on this page. Exact means, materials and inspections follow the property, approved documents and contracted scope.