◆ LICENSED · BONDED · $5M INSURED
Let’s Talk (817) 752-5900

Custom Home Concept

Barndominium + Shop.
2,800 Square Feet.

A real residence and a working tall-bay shop designed as one coordinated building—not a shell with rooms added later.

Barndominium + Shop exterior architectural concept
Architectural Design Concept

How The Home Works

Clean Separation Of Uses

The home runs along the quiet side of the structure, with the kitchen and porch facing the property. A mudroom and utility core buffer the shop from bedrooms, odors, noise and large overhead doors.

Property Match

Best Site Fit

Acreage with room for truck turning, trailer storage and a direct service drive. Shop drainage, exterior work areas, septic placement and long electrical runs can control where the building sits.

Build It Intentionally

Construction Focus

Metal-building engineering, slab loading, condensation control, insulation, air sealing and the fire-rated separation between shop and residence must work as a system. Shop ventilation and make-up air depend on actual equipment use.

Bay Height

Set clear height from lifts, RVs, boats or equipment—not from an arbitrary kit package.

Power

Plan panel capacity, welders, compressors, EV charging and future equipment loads.

Floor Performance

Thickened or isolated pads where lifts and concentrated loads require them.

Dust And Sound

Use sealed transitions, pressure control and durable cleanable surfaces at the connection.

2026 Planning Range

$630,000–$1,050,000

For an early DFW construction discussion, this 2,800-square-foot concept uses a broad range of $630,000–$1,050,000. Land, design, financing and unusual site infrastructure remain separate until included in a written scope.

Read the shared planning and property-review guidance.

Licensed · Bonded · $5M Insured

Adapt The Barndominium + Shop To Your Property.

Bring plans, a property address, or simply an idea. We’ll help you understand the next step.

Professional protection for residential and commercial work. No finished plans required.
Engineered shell and slab construction
Engineered shell and slab construction · Illustrative construction visualization
Shop power, insulation and ventilation
Shop power, insulation and ventilation · Illustrative construction visualization
Completed residence and working shop
Completed residence and working shop · Illustrative construction visualization
Call Our TeamStart Your Project ↗