◆ LICENSED · BONDED · $5M INSURED
Let’s Talk (817) 752-5900

Custom Home Concept

Courtyard + Casita.
3,400 Square Feet.

A private outdoor room connects the main house with an independent guest or work suite.

Courtyard + Casita exterior architectural concept
Architectural Design Concept

How The Home Works

Three Addresses Around One Court

The main entry, daily living zone and casita each face the courtyard. Guests can arrive without crossing family bedrooms, while the breezeway keeps the suite connected for meals and gatherings.

Property Match

Best Site Fit

Wide lots or private acreage where the courtyard can be shielded from road views and strong afternoon sun. Detached-building setbacks, utilities and fire access should be checked before committing to separation.

Build It Intentionally

Construction Focus

The casita may need dedicated HVAC, hot water, subpanel and data. Covered connectors, drainage at the court and waterproof exterior thresholds determine whether the space feels integrated during North Texas storms.

Casita Program

Guest suite, quiet office, caregiver space or independent family room.

Court Character

Pool court, shaded garden, outdoor dining or low-maintenance hardscape.

Connection

Fully detached, conditioned connector or open breezeway based on privacy and weather.

Utility Strategy

Shared central systems or independent equipment for flexible long-term use.

2026 Planning Range

$1,020,000–$1,700,000

For an early DFW construction discussion, this 3,400-square-foot concept uses a broad range of $1,020,000–$1,700,000. Land, design, financing and unusual site infrastructure remain separate until included in a written scope.

Read the shared planning and property-review guidance.

Licensed · Bonded · $5M Insured

Adapt The Courtyard + Casita To Your Property.

Bring plans, a property address, or simply an idea. We’ll help you understand the next step.

Professional protection for residential and commercial work. No finished plans required.
Surveyed homesite and preserved trees
Surveyed homesite and preserved trees · Illustrative construction visualization
Infill construction and neighbor protection
Infill construction and neighbor protection · Illustrative construction visualization
Completed acreage site and drainage
Completed acreage site and drainage · Illustrative construction visualization
Call Our TeamStart Your Project ↗